Services

All Hydraulic Hammer Shops are NOT created equal!!!!!

Unlike most hydraulic shops, HBS offers complete machine shop services. With our knowledge and capabilities to rebuild worn or cracked parts like Pistons, Cylinders, Front Heads, back to size allowing HBS to save your company the high cost of new replacement parts. We also stock a wide range of used parts available for core exchange.

CRACKED HEADS

Due to dry firing, prying or improper use.

NOT A PROBLEM!!

At Hydraulic Breaker Services we specialize in refurbishing cracked front heads, whether just small hairline cracks or completely cracked in two. We also stock a wide range of used and rebuilt tool holders and front heads.

Explanation of Program for Standard Rebuilds

Shortly after arrival, your breaker is disassembled and fully inspected. A detailed estimate of parts and services is prepared and sent to you for your approval. Once authorized to proceed, we typically have the breaker ready to ship back to you in 3-7 working days.

Breaker reconditioning includes the following:

The main body is removed from the outer bracket and separated into front tool holder section, N2 (back cap) section and cylinder sections. Many cylinder sections include an accumulator – this is removed from the cylinder and put aside for inspection.

After removal of all interior and exterior components from the cylinder section, the original factory machining access plugs are removed and the cylinder section is dipped. Removing the machining access plugs insures that no contamination remains lodged in the internal passages (most shops rebuilding breakers do not thoroughly cleanse the cylinder section therefore future seals life is shortened). After new access plugs are installed in the cylinder section and it is ready to be rebuilt.

All new seals are added to the cylinder body, control valve body and BPM adjuster case IMG_7224assemblies and the piston and upper seal carriers are reinstalled. At this point the original piston has been inspected and either reworked per factory service procedures or replaced with a new one. The main body accumulator, having been inspected and rebuilt with a new bladder, is reinstalled on the main cylinder and new upper and lower bushings have been installed in the tool holder section. N2 section, cylinder section and tool holder sections are reassembled and all fasteners are brought up to factory torque specs. Machinery quality paint and new decals are applied.

Serviced NPK GH40 and Indeco HP16000

Here are some pictures of some of the massive breaker that HBS has rebuilt recently, including: NPK GH40 and Indeco HP16000. Not many shops can service a breaker of this size, but here at HBS, it’s no problem.

NPK GH40 Before & After Photos

HP16000 Before & After Photos

WordPress Video Lightbox